RLW Roofing was appointed by BAM Construction to carry out the roofing and cladding works at King Edward VI School for Girls in Handsworth. The project involved refurbishment and redevelopment across several school buildings and required a mix of practical roofing solutions and carefully detailed cladding systems. RLW worked closely with the main contractor throughout to make sure the programme was met and all works complied with current education building standards.

The main roofing system installed was Bauder Bio-Solar Bakor hotmelt, chosen for its durability and environmental performance. In additional roof areas, Bauder Total Felt roofing was used as a reliable and cost-effective alternative.

A standout feature of the project was the PPC aluminium hit-and-miss cladding, which was used extensively across the elevations. The hit-and-miss design added depth and interest to the façade while also providing screening where required.

This system required careful setting out to ensure consistent spacing and alignment across the building. Achieving a neat, uniform appearance was particularly important where the cladding met windows, doors, and corner details. RLW worked through these challenges by agreeing clear setting-out lines early on and coordinating closely with other trades to avoid clashes and rework.

Alongside the aluminium systems, RLW installed Equitone fibre cement panels in both Linea and Natura finishes. Equitone Linea was used to introduce horizontal definition to the façade, while Equitone Natura provided a smooth finish. Both systems were detailed to sit neatly alongside the aluminium cladding, ensuring a cohesive overall appearance. Additional cladding included PPC aluminium panels and Eurobond composite wall cladding, giving further variation while maintaining durability and low maintenance.

The project was delivered through good planning, attention to detail, and close collaboration with BAM Construction. The finished buildings meet the practical needs of a busy school environment while delivering a modern, well-considered external appearance.

Project Details

Project: King Edward VI School for Girls


Product: Bauder Bio-Solar Bakor Hotmelt Roofing, Bauder Total Felt Roofing, Equitone Cladding, PPC Aluminium Cladding, Eurobond Composite Wall Cladding, PPC Aluminium Hit-and-Miss Cladding

Contractor: BAM Construction

Value: £2 million